Vertical temperature differences in Three-Mile Slough, during
a five-day period in June 1999. The west piling and the east piling
were each fitted with three thermistors:
Ti, at the level of the transducer; T3, one meter below the transducer;
and T1, 1.5 m above the transducer. There is evidence for substantial
thermal gradients above the transducers, with some sort of daily or
tidal cycle.